Tailcone – Getting ready soon!

These past three weeks were very busy. I went to USA, to Aurora, OR to visit Van’s Aircraft factory and pick up my wings for RV10. That was during COVID time, thus I took all required precautions to stay safe.

At the same time we finished construction of our kitchen at the hangar. We finally can seat all together with kids and have lunch while watching TV at our hangar.

Finally I started annual inspection of our Piper PA28-235. This is separate process and I do some videos about it aswell.

My tailcone gets ready. I already finished riveting and assembly of the aft deck. Now its time to rivet top skins and all should be finally done.

Leave a Reply

Your email address will not be published. Required fields are marked *